Resource Library
-
Stage 3 Feasibility Study Report
-
Stage 3 Civil Engineering (Power) Report
-
Stage 3 Development of Scheme Options Report
-
Stage 3 Financial Modelling Report
-
Stage 3 Cost Management Report
-
Stage 3 Sustainability Report
-
Stage 3 Navigation Options Report
-
Stage 3 Landside Facilities Report
-
Stage 3 Socio-Economic Impacts Report
-
Stage 3 Marine Ecology Report
-
Stage 2 Options Report - Non Technical Summary
-
Stage 2 Options Report
-
Statement of Community Consultation Round One
-
Aquatic Ecology Surveys - Autumn 2009 Baseline Report
-
2009 Breeding and Passage Bird Survey Report
-
Winter Bird Report 2009 - 2010
-
Winter Bird Report 2008 - 2009
-
Sustainability Scoping Report Consultation
-
Stage 1 Options Report - Non Technical Summary
-
Stage 1 Options Report
Stage 3 Cost Management Report
June 2011
To support the Stage 3 option appraisal process, T&T have developed high level cost models to help test the viability of each scheme option. These high level capital cost models are based on the design information to support the Stage 3 study together with verbal and e-mail correspondence provided by the Feasibility Study team.
