Resource Library
-
Stage 3 Feasibility Study Report
-
Stage 3 Civil Engineering (Power) Report
-
Stage 3 Development of Scheme Options Report
-
Stage 3 Financial Modelling Report
-
Stage 3 Cost Management Report
-
Stage 3 Sustainability Report
-
Stage 3 Navigation Options Report
-
Stage 3 Landside Facilities Report
-
Stage 3 Socio-Economic Impacts Report
-
Stage 3 Marine Ecology Report
-
Stage 2 Options Report - Non Technical Summary
-
Stage 2 Options Report
-
Statement of Community Consultation Round One
-
Aquatic Ecology Surveys - Autumn 2009 Baseline Report
-
2009 Breeding and Passage Bird Survey Report
-
Winter Bird Report 2009 - 2010
-
Winter Bird Report 2008 - 2009
-
Sustainability Scoping Report Consultation
-
Stage 1 Options Report - Non Technical Summary
-
Stage 1 Options Report
Stage 3 Development of Scheme Options Report
June 2011
This report presents the results of an advanced case study referring to a Tidal Barrage in the Mersey Estuary equipped with large diameter turbines (assumed for the moment to be of Bulb type) and a series of large sluice gates.
